Evaluation of risks affecting international construction joint venture (ICJV) projects in Ghana

Author:

Akunyumu Stephen,Fugar Frank,Adinyira Emmanuel

Abstract

Purpose The failure rate of international construction joint venture (ICJV) projects has been noted to be high in developing countries due to the complexity and risky nature of construction projects in the international market. The purpose of this study is to identify and evaluate the risks facing ICJV projects in Ghana. Design/methodology/approach A risk register was developed through a comprehensive literature review. The identified risks were then used in a questionnaire survey involving local and foreign partners in ICJV projects in Ghana. Findings From a total of 74 risks identified, categorized into country-level risks, market-level risks and project-level risks, the “top ten” risks found to be the most critical risks facing ICJV projects in Ghana include unstable currency exchange rates, inflation, design changes, high-interest rate, budget overrun, cash flow problems of the client, economy fluctuation, difficulty in obtaining approval of projects from host government authorities/bureaucracy, potential financial distress of JV partner and bribery and corruption. Originality/value This study provides a comprehensive list of risks ICJV partners are likely to encounter on their projects in developing countries. Furthermore, this study improves on one of the major limitations of previous ICJV studies by collecting data from both partners of the ICJV, appropriate for cross-cultural examination and comparison.

Publisher

Emerald

Subject

General Engineering,Building and Construction

Reference116 articles.

1. Potential risks to international joint ventures in developing economies: the Ghanaian construction industry experience Hanoi Vietnam,2011

2. Analysis of factors influencing project cost estimating practice;Construction Management and Economics,2001

3. An assessment of the readiness of construction firms for international construction joint ventures (ICJVs) using the VERDICT model;Journal of Engineering, Design and Technology,2021

4. Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects;Journal of Construction in Developing Countries,2013

5. Construction projects cost overrun: what does the literature tell us?;International Journal of Innovation, Management and Technology,2017

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3