Abstract
PurposeThe effects of the COVID-19 outbreak on the construction industry were formidable and far-reaching, as the construction sector is a major contributor to the gross domestic product (GDP), which balances various sectors of the global economy, and to infrastructure growth, which is a primary gauge of a nation’s advancement. The outbreak led to workforce disruptions, worker deficits, dwindling efficiency, elongated project durations, and scarce opportunities for training and mentorship, and despite endeavors to mitigate these challenges, construction timelines experienced significant interruptions. Various researchers have pinpointed contributing elements, but few have constructed a predictive model to gauge the degree of impact.Design/methodology/approachTherefore, this research intends to fill by introducing an ordinal logistic regression method to forecast the impacts of a pandemic or other similar type of crisis. To achieve this, an online survey was developed and distributed to collect the perceptions of the construction engineers and managers about the diverse contributors to the exceeding project timelines during the COVID-19 pandemic outbreak.FindingsFindings from this study indicate that financial liquidity, modifications to original plans, delays in securing governmental clearances, and a shortage of competent labor have medium-to-high levels of impact on project schedules.Originality/valueThis study will furnish decision-makers with crucial knowledge that will give them the tools to refine their strategies and judiciously allocate resources to overcome the unique hurdles encountered by various construction segments and will enhance the industry's capability to respond more effectively to challenges inherent in this type of crisis.
Reference50 articles.
1. Delays and financial implications of COVID-19 for contractors in irrigation Projects;Journal of Construction Engineering and Management,2022
2. Analysis of the factors affecting construction project cost during COVID-19,2023
3. Evaluation of challenges to the construction industry's project efficiency caused by COVID-19 pandemic,2023
4. Evaluation of the activities adopted to mitigate the health and safety challenges of COVID-19,2023
5. Links between binary and multi-category logit item response models and quasi-symmetric loglinear models;Annales de la Faculté des sciences de Toulouse: Mathématiques,2002