Abstract
Purpose
The purpose of this paper is to examine the effectiveness of the multivariable grey prediction model in deformation forecasting.
Design/methodology/approach
Deformation in a dam can be seen because of many factors but without any doubt, the most influential factor is the water level. In this study, the deformation level of a point in the Keban Dam crest has been tried to be forecasted depending on the water level by the multivariable grey model GM(1,N). Regression analysis was used to test the accuracy of the prediction results obtained using the grey prediction model.
Findings
The results show that there is a great consistency between the grey prediction values and the actual values, and that the GM(1,N) produces more reliable results than the regression analysis. Based on the results, it can be concluded that the GM(1,N) is a very reliable estimation model for limited data conditions.
Originality/value
Different from the other studies in the literature, this study investigates deformation in a dam subject to the water level in the dam reservoir. The main contribution of the study to the literature is to suggest a relatively new procedure for estimating the deformation in the dams based on the water level.
Reference25 articles.
1. Control problems of grey system;Systems & Control Letters,1982
2. Introduction to grey system theory;The Journal of Grey System,1989
3. Parameter optimized of GM(1,1) model and its application in subsidence and deformation of high building,2010
4. Deformation forecasting with a novel high precision grey forecasting model based on genetic algorithm;Computer Modeling & New Technologies,2014
5. Horizontal deflection analysis of a large earthen dam by means of geodetic and geotechnical methods,2008
Cited by
15 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献