Ayat Muhammad,Qureshi Sheheryar Mohsin,Kang Changwook
Abstract
Purpose
The purpose of this study is to propose an improved framework for managing Private Participation in Infrastructure ICT (PPI-ICT) projects in the context of developing countries as the requirements to manage them are different in several aspects.
Design/methodology/approach
The framework has been proposed based on an exhaustive literature review and statistical analysis of the PPI-ICT projects’ data set using logistic regression, F-test and student’s t-test. The proposed framework was also applied to the PPI-ICT projects.
Findings
The framework is an extension to NTCP (novelty, technology, complexity and pace) approach by including extrinsic factors such as income of the country, climate risk, religious diversity, political stability, regularity quality and control of corruption. The proposed framework was used to analyze project characteristics and their external conditions in the context of developing countries. Based on the analyses, the authors have presented a detailed set of recommendations for project managers, practitioners and governments to improve the success rate of these projects.
Originality/value
The major contribution of this study is the framework, which encompasses the NTCP model as well as extrinsic characteristics of PPI-ICT projects. The proposed framework is meant to assist the project managers to comprehend the project characteristics and its external environment to identify an adequate approach for managing projects successfully.
Reference89 articles.
1. Technological invention to product innovation: a project management approach;International Journal of Project Management,2010
2. Analysis of cost and schedule performance of international development projects;International Journal of Project Management,2010
3. Identification and classification of ERP critical failure factors in Iranian industries;Information Systems,2012
4. Evaluation of the impact of risk management on project performance in small construction firms in South Africa: the case study of construction systems;Journal of Engineering, Design and Technology,2019
5. Investigation into the causes of delay in land acquisition for PPP projects in developing countries;Journal of Engineering, Design and Technology,2017
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献