Author:
Dohi Tadashi,Okamura Hiroyuki,Qian Cun Hua
Abstract
PurposeIn this paper, the authors propose two construction methods to estimate confidence intervals of the time-based optimal software rejuvenation policy and its associated maximum system availability via a parametric bootstrap method. Through simulation experiments the authors investigate their asymptotic behaviors and statistical properties.Design/methodology/approachThe present paper is the first challenge to derive the confidence intervals of the optimal software rejuvenation schedule, which maximizes the system availability in the sense of long run. In other words, the authors concern the statistical software fault management by employing an idea of process control in quality engineering and a parametric bootstrap.FindingsAs a remarkably different point from the existing work, the authors carefully take account of a special case where the two-sided confidence interval of the optimal software rejuvenation time does not exist due to that fact that the estimator distribution of the optimal software rejuvenation time is defective. Here the authors propose two useful construction methods of the two-sided confidence interval: conditional confidence interval and heuristic confidence interval.Research limitations/implicationsAlthough the authors applied a simulation-based bootstrap confidence method in this paper, another re-sampling-based approach can be also applied to the same problem. In addition, the authors just focused on a parametric bootstrap, but a non-parametric bootstrap method can be also applied to the confidence interval estimation of the optimal software rejuvenation time interval, when the complete knowledge on the distribution form is not available.Practical implicationsThe statistical software fault management techniques proposed in this paper are useful to control the system availability of operational software systems, by means of the control chart.Social implicationsThrough the online monitoring in operational software systems, it would be possible to estimate the optimal software rejuvenation time and its associated system availability, without applying any approximation. By implementing this function on application programming interface (API), it is possible to realize the low-cost fault-tolerance for software systems with aging.Originality/valueIn the past literature, almost all authors employed parametric and non-parametric inference techniques to estimate the optimal software rejuvenation time but just focused on the point estimation. This may often lead to the miss-judgment based on over-estimation or under-estimation under uncertainty. The authors overcome the problem by introducing the two-sided confidence interval approach.
Subject
Strategy and Management,General Business, Management and Accounting
Reference22 articles.
1. Optimizing preventive service of the software products;IBM Journal of Research and Development,1984
2. Proactive management of software aging;IBM Journal of Research and Development,2001
3. Estimating software rejuvenation schedule in high assurance systems;The Computer Journal,2001
4. Comparing software rejuvenation policies under different dependability measures;IEICE Transactions on Information and Systems (D),2004
5. Optimal periodic software rejuvenation policies based on interval reliability criteria;Reliability Engineering and System Safety,2018
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献