Abstract
Purpose
The selection of the contractor, as a main participant of a construction project, is the most important and challenging decision process for a client. The purpose of this paper is to propose a multi-agent systems (MAS)-based contractor pre-qualification (CP) model for the construction sector in the frame of the tender management system.
Design/methodology/approach
The meta-classification and analysis study of the existing literature on CP, contractor selection and criteria weighting issues, which examines the current and important CP criteria, other than price, is introduced structurally. A quantitative survey, which is carried out to estimate initial weightings of the identified criteria, is overviewed. MAS are used to model the pre-qualification process and workflows are shown in Petri nets formalism. A user-friendly prototype program is created in order to simulate the tendering process. In addition, a real case regarding the construction work in Turkey is analyzed.
Findings
There is a lack of non-human-driven solutions and automation in CP and in the selection problem. The proposed model simulates the pre-qualification process and provides consistent results.
Research limitations/implications
The meta-classification study consists of only peer-reviewed papers between 1992 and 2013 and the quantitative survey initiates the perspectives of the actors of Turkish construction sector. Only the traditional project delivery method is selected for the proposed model, that is other delivery methods such as design/build, project management, etc., are not considered. Open, selective limited and negotiated tendering processes are examined in the study and the direct supply is not considered in the scope.
Practical implications
The implications will help to provide an objective CP and selection process and to prevent the delays, costs and other troubles, which are caused by the false selection of a contractor.
Originality/value
Automation and simulation in the pre-qualification and the selection of the contractor with a non-human-driven intelligent solution ease the decision processes of clients in terms of cost, time and quality.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference64 articles.
1. Design-build pre-qualification and tendering approach for public projects;International Journal of Project Management,2005
2. Arciszewski, T., Skolicki, Z. and DeJong, K. (2005), “Intelligent agents, fundamentals”, in Anumba, C.J., Ugwu, O.O. and Ren, Z. (Eds), Agents and Multi-Agent Systems in Construction, Taylor and Francis, London, pp. 6-30.
3. Improving sub-contractor selection process in construction projects: web-based sub-contractor evaluation system (WEBSES);Automation in Construction,2008
4. Contractor selection with multi criteria decision support tools;International Journal of Industrial and Systems Engineering,2009