Reliability analysis of underground rock bolters using the renewal process, the non-homogeneous Poisson process and the Bayesian approach

Author:

La Roche-Carrier Nicolas,Dituba Ngoma Guyh,Kocaefe Yasar,Erchiqui Fouad

Abstract

Purpose Reliability plays an important role in the execution of the maintenance improvement and the understanding of its concepts is essential to predict the type of maintenance according to the equipment state. Thereby, a computational tool was developed and programming with VBA in Excel® for reliability and failure analysis in a mining context. The paper aims to discuss these issues. Design/methodology/approach The developed approach use the modeling of stochastic processes, such as the renewal process, the non-homogeneous Poisson process and less conventional method as the Bayesian approach, by considering Jeffreys non-informative prior. The resolution gives the best associated model, the parameters estimation, the mean time between failure and the reliability estimate. This approach is validated with the reliability analysis of inter-failure times from underground rock bolters subsystems, over a two-year period. Findings Results show that Weibull and lognormal probability distribution fit to the most subsystems inter-failure times. The study revealed that the bolting head, the rock drill, the screen handler, the electric/electronic system, the hydraulic system, the drilling feeder and the structural consume the most repair frequency. The hydraulic and electric/electronic subsystems represent the lowest reliability after 50 operation hours. Originality/value For the first time, this case study defines practical failures and reliability information for rock bolter subsystems based on real operation data. This paper is useful to the comparative evaluation of rock bolter by detecting the weakest elements and understanding failure patterns in the individual observation subsystems on the overall machine performance.

Publisher

Emerald

Subject

Strategy and Management,General Business, Management and Accounting

Reference61 articles.

1. Estimation of reliability-based maintenance time intervals of load-haul-dumper in an underground coal mine;Journal of Mining and Environment,2018

2. Reliability and maintainability analysis of crushing plants in Jajarm Bauxite Mine of Iran,2005

3. An overview of collection, analysis, and application of reliability data in the process industries;IEEE Transactions on Reliability,1988

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3