1. Abdel‐Meguid, T.A. and Davidson, C.H. (1996), “Managed claims procurement strategy (MCPS): a preventive approach”, in Taylor, R.G. (Ed.),“North Meets South”: Proceedings of the CIB W92 Procurement Systems Symposium, Durban, South Africa, pp. 11‐20.
2. Azhar, N., Farooqui, R.U. and Ahmed, S.M. (2008), “Cost overrun factors in construction industry of Pakistan”,Proceedings of First International Conference on Construction in Developing Countries (ICCIDC‐I) “Advancing and Integrating Construction Education, Research & Practice”, Karachi, Pakistan, August 4‐5.
3. Baxter, P. and Jack, S. (2008), “Qualitative case study methodology: study design and implementation for novice researchers”,The Qualitative Report, Vol. 13 No. 4, pp. 544‐559, available at: www.nova.edu/ssss/QR/QR13‐4/baxter.pdf (accessed December 29, 2011).
4. Bowen, P.A., Hindle, R.D. and Pearl, R.G. (1997), “The effectiveness of building procurement systems in the attainment of client objectives”,CIB W92 Procurement Symposium, Montreal, Canada, May 20‐23, pp. 39‐49.
5. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study