1. Albin, S.L.
and
Chao, S.
(1992), “Preventative replacement in systems with dependent components”,
IEEE Transactions on Reliability
, Vol. 41 No. 2, pp. 230-238.
2. ANSI/IEEE C.57.117-1986
(1986), “IEEE guide for reporting failure data for power transformers and shunt reactors on electric utility power systems”, IEEE Standards, New York, NY.
3. ANSI/IEEE C.57.91-1995
(1995), “IEEE guide for loading mineral-oil-immersed transformers”, IEEE Standards, New York, NY.
4. Azevedo, A.C.
,
Delaiba, A.C.
,
Oliveira, J.C.
,
Carvalho, B.C.
and
Bronzeado, H.
(2007), “Transformer mechanical stress caused by external short circuit: a time domain approach”, International Conference on Power Systems Transients (IPST), Lyon, June 4-7.
5. Barros, A.
,
Berenguer, C.
and
Grall, A.
(2003), “Optimization of replacement times using imperfect monitoring information”,
IEEE Transactions on Reliability
, Vol. 52 No. 3, pp. 523-533.