What do post-disaster reconstruction project success indicators look like? End-user’s perspectives

Author:

Charles Shawn Hezron,Chang-Richards Alice,Yiu Tak Wing

Abstract

Purpose This paper aims to investigate the emergence of new success measures for buildings and infrastructure post-disaster reconstruction projects, beyond the traditional ”iron triangle”, which have gained prominence with the increased involvement of clients and end-users in these projects. Consequently, the industry is obliged to reconsider the critical factors regarding what constitutes a successful outcome from the perspectives of these stakeholders. Design/methodology/approach Data was gathered from end-users in four Caribbean islands using a questionnaire survey on eight empirical success indicators obtained from an extensive systematic literature review. To elicit a ranking and correlations amongst the end-user’ perspectives on the indicators, factor analysis and structural equation modelling techniques (SEM) were conducted. Findings The factor analysis found “safety” to be the most important empirical success measure, while “change” ranked the least important. Correlation analysis using SEM identified two new composite indicators, namely, “competence” with delivering timely and quality environmentally friendly and sustainable projects and “adaptability” in ensuring project objectives reflect beneficiaries’ expectations amidst internal and external influences, to be critical of end-users’ measurement indicators that describe their assessment mechanism. Measurement and structural models validated “safety” and “satisfaction” to be the highest loading variables in the two composites, respectively. Research limitations/implications The research focussed on findings in English language articles; therefore, any claim to a complete list of indicators from the literature can be amiss. Practical implications Results confirm the traditional “iron triangle” of time, cost and quality to be limited in assessing reconstruction project outcomes and the views and expectations of the potential beneficiaries need to be factored in the planning, design, execution and post-handover stages in all reconstruction projects. Originality/value This paper was very specific in its attempt to investigate new success indicators for reconstruction project outcomes, aiming to assist with developing comprehensive project objectives that resonate with all stakeholder groups.

Publisher

Emerald

Subject

Safety, Risk, Reliability and Quality,Building and Construction

Reference122 articles.

1. Discriminant validity assessment: use of Fornell and Larcker criterion versus HTMT criterion;Journal of Physics: Conference Series,2017

2. Critical success factors (CSFs) for sustainable affordable housing;Building and Environment,2019

3. Critical success criteria for mass house building projects in developing countries;International Journal of Project Management,2008

4. Study of ICT adoption for building project management in the Indian construction industry;Automation in Construction,2009

5. Critical design factors for minimising waste in construction projects: a structural equation modelling approach;Resources, Conservation, and Recycling,2018

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3