Author:
Rødseth Harald,Schjølberg Per
Abstract
Purpose
The purpose of this paper is to develop a novel model for maintenance backlog (MB) of physical assets and structure it in a framework for integrated planning (IPL).
Design/methodology/approach
Reliability theory principles for modelling MB are used. Furthermore, to structure a framework for IPL, literature study combined with earlier case studies is used.
Findings
The framework for IPL facilitates the model of MB. In addition to providing real-time diagnosis indicators, MB is regarded as valuable information for decision support in IPL.
Originality/value
Development of MB applied to IPL.
Subject
Industrial and Manufacturing Engineering,Strategy and Management,Safety, Risk, Reliability and Quality
Reference80 articles.
1. If planning isn’t everything, maybe it’s something;Town Planning Review,1981
2. Methodology and theory a framework for strategic planning in maintenance;Journal of Quality in Maintenance Engineering,2011
3. Short term maintenance planning,1999
4. Integrated maintenance planning and production scheduling with Markovian deteriorating machine conditions;International Journal of Production Research,2014
5. Evaluating and optimising integrated planning in complex production assets: learnings from offshore petroleum industry;International Journal of Decision Sciences, Risk and Management,2010
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. A Data-driven Approach to Predict Maintenance Delays for Time-based Maintenance;2023 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM);2023-12-18
2. Integrated Production and Maintenance Planning for Successful Asset Management Strategy Implementation;Engineering Assets and Public Infrastructures in the Age of Digitalization;2020