ANN-based prediction intervals to forecast labour productivity

Author:

Nasirzadeh Farnad,Kabir H.M. DipuORCID,Akbari Mahmood,Khosravi Abbas,Nahavandi Saeid,Carmichael David G.ORCID

Abstract

PurposeThis study aims to propose the adoption of artificial neural network (ANN)-based prediction intervals (PIs) to give more reliable prediction of labour productivity using historical data.Design/methodology/approachUsing the proposed PI method, various sources of uncertainty affecting predictions can be accounted for, and a PI is proposed instead of a less reliable single-point estimate. The proposed PI consists of a lower and upper bound in which the realization of the predicted variable, namely, labour productivity, is anticipated to fall with a defined probability and represented in terms of a confidence level (CL).FindingsThe proposed PI method is implemented on a case study project to predict labour productivity. The quality of the generated PIs for the labour productivity is investigated at three confidence levels. The results show that the proposed method can predict the value of labour productivity efficiently.Practical implicationsThis study is the first attempt in construction management to undertake a shift from deterministic point predictions to interval forecasts to improve the reliability of predictions. The proposed PI method will help project managers obtain accurate and credible predictions of labour productivity using historical data. With a better understanding of future outcomes, project managers can adopt appropriate improvement strategies to enhance labour productivity before commencing a project.Originality/valuePoint predictions provided by traditional deterministic ANN-based forecasting methodologies may be unreliable due to the different sources of uncertainty affecting predictions. The current study proposes ANN-based PIs as an alternative and robust tool to give a more reliable prediction of labour productivity using historical data. Using the proposed method, various sources of uncertainty affecting the predictions are accounted for, and a PI is proposed instead of a less reliable single point estimate.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference54 articles.

1. Similarity-based error prediction approach for real-time inflow forecasting;Hydrology Research,2013

2. Quantifying the impact of schedule compression on labour productivity for mechanical and sheet metal contractor;Journal of Construction Engineering and Management,2007

3. Factors affecting labour productivity on building projects in Zimbabwe;Journal of Architecture, Engineering and Construction,2014

4. Factors influencing construction labour productivity in Egypt;Journal of Management in Engineering,2014

Cited by 22 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3