Zhang Lihui,Dai Guyu,Zou Xin,Qi Jianxun
Abstract
PurposeInterrupting work continuity provides a way to improve some project performance, but unexpected and harmful interruptions may impede the implementation. This paper aims to mitigate the negative impact caused by work continuity uncertainty based on the notion of robustness.Design/methodology/approachThis paper develops a float-based robustness measurement method for the work continuity uncertainty in repetitive projects. A multi-objective optimization model is formulated to generate a schedule that achieves a balance between crew numbers and robustness. This model is solved using two modules: optimization module and decision-making module. The Monte Carlo simulation is designed to validate the effectiveness of the generated schedule.FindingsThe results confirmed that it is necessary to consider the robustness as an essential factor when scheduling a repetitive project with uncertainty. Project managers may develop a schedule that is subject to delays if they only make decisions according to the results of the deadline satisfaction problem. The Monte Carlo simulation validated that an appropriate way to measure robustness is conducive to generating a schedule that can avoid unnecessary delay, compared to the schedule generated by the traditional model.Originality/valueAvailable studies assume that the work continuity is constant, but it cannot always be maintained when affected by uncertainty. This paper regards the work continuity as a new type of uncertainty factor and investigates how to mitigate its negative effects. The proposed float-based robustness measurement can measure the ability of a schedule to absorb unpredictable and harmful interruptions, and the proposed multi-objective scheduling model provides a way to incorporate the uncertainty into a schedule.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference40 articles.
1. Multi-objective genetic optimization for scheduling a multi-storey building;Automation in Construction,2014
2. A bi-objective model for robust resource-constrained project scheduling;International Journal of Production Economics,2005
3. Minimizing duration and crew work interruptions of repetitive construction projects;Automation in Construction,2018
4. Float analysis of non-serial repetitive activities;Construction Management and Economics,2003
5. LOB and CPM integrated method for scheduling repetitive projects;Journal of Construction Engineering and Management,2013
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献