1. Ahmed, S. and Masjuki, H.H. (2001), “The successful implementation of TPM in conjunction with EOM and 5Ss: a case presentation”, submitted for Journal of Quality in Maintenance Engineering.
2. Ahmed, S., Ghani, A.K. and Shekaran, J. (2000a), “Towards identification of big losses under total productive maintenance”, Proceedings of the International Conference on Manufacturing (ICM2000), 24‐26 February, BUET, Dhaka, pp. 717‐26.
3. Ahmed, S., Ghani, A.K. and Shekaran, J. (2000b), “Phases of elimination of six big losses of a manufacturing maintenance system under total productive maintenance environment”, Proceedings of the International Conference on Manufacturing (ICM2000), 24‐26 February, BUET, Dhaka, pp. 727‐39.
4. Al‐Sultan, K. and Duffuaa, S.O. (1995), “Maintenance control via mathematical programming”, International Journal of Quality & Reliability Management, Vol. 1 No. 3, pp. 859‐77.
5. Anderson, M. and Sohal, A.S. (1999), “A study of the relationship between quality management practices and performance in small businesses”, International Journal of Quality & Reliability Management, Vol. 16 No. 9, pp. 859‐77.