Author:
Chen Wen‐Jinn,Liao Ching‐Jong
Abstract
PurposeMachine maintenance is essential in many industries. How to schedule maintenance becomes especially important when achieving high shop performance is desired. This paper aims to consider the maintenance scheduling problem in a company where different maintenance situations exist.Design/methodology/approachThe company, which is famous in South East Asia, specializes in the manufacturing of textiles such as polypropylene and chemical chip. In this paper an algorithm is presented, for five specific situations, for the company to minimize the number of tardy jobs.FindingsOwing to machine overload in 24‐hour production, machine breakdowns usually occur in the shop. There is an urgent need for the company to derive a procedure that will incorporate the maintenance into the schedule to reduce the machine breakdown. Computational results have showed that the proposed algorithm outperforms the current method with an average improvement of 32.5 percent, although the actual average improvement is somewhat lower partly because some jobs are unexpectedly cancelled or changed.Practical implicationsThis proposed algorithm is appropriate not only for the studied company, but for those companies where maintenance has to be operated one or several times a month and the maintenance time is so significant that it cannot be ignored.Originality/valueProvides an algorithm to aid in the maintenance scheduling problem.
Subject
Industrial and Manufacturing Engineering,Strategy and Management,Safety, Risk, Reliability and Quality
Reference6 articles.
1. Adiri, I., Frostig, E. and Rinnooy, K.A.H.G. (1991), “Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs”, Naval Research Logistics, Vol. 38, pp. 261‐71.
2. Asano, M. and Ohta, H. (1998), “Scheduling with shutdowns and sequence‐dependent set‐up times”, International Journal of Production Research, Vol. 37, pp. 1661‐76.
3. French, S. (1982), Sequencing and Scheduling: An Introduction to the Mathematics of the Job‐Shop, Ellis Horwood, Chichester.
4. Lee, C.Y. (1997), “Minimizing the makespan in the two‐machine flowshop scheduling problem with an availability constraint”, Operations Research Letters, Vol. 20, pp. 129‐39.
5. Leon, V.J. and Wu, S.D. (1992), “On scheduling ready‐time, due‐dates and vacations”, Naval Research Logistics, Vol. 39, pp. 53‐65.