1. Modelling information flow during the conceptual and schematic stages of building design
2. Ballal, T.M. 2000: The use of artifi cial neural networks for modelling buildability in preliminary structural design. PhD thesis,Loughborough University of Technology, Loughborough, UK.
3. Boussabaine, A. 1991: An expert system prototype for construction planning and productivity analysis. PhD thesis,University of Manchester, Manchester, UK.