Abstract
Purpose
The purpose of this paper is to identify the factor groupings of a set of 19 critical success factors (CSFs) associated with managing public-private partnership (PPP) projects at the operational stage and examine the most significant factor grouping using fuzzy synthetic evaluation (FSE) technique.
Design/methodology/approach
The paper adopted a comprehensive review of the pertinent literature and an empirical questionnaire survey geared towards targeted international PPP experts. Survey responses were analysed using factor analysis and FSE modelling.
Findings
The results from factor analysis show five CSF groupings (CSFGs) for managing operational PPPs. These are proficient service delivery and adequate legal structures, simplified payment mechanism and consistent project monitoring, effective contract variations management, suitable stakeholder management mechanism and environmental health and safety control. The FSE modelling shows that “simplified payment mechanism and consistent project monitoring”, is the most critical CSFG. The operational management CSFs under this grouping are acceptable level of user fee charges, efficient and well-structured payment mechanism, consistent project performance monitoring and long-term demand for public facility.
Research limitations/implications
The major limitation lies in the low sample size that was used for analysis; however the years of research and/or industrial experience of respondents and the wide coverage of different cultural backgrounds (18 countries from five regions globally) contribute to the authenticity of the survey responses. Future research should adopt interviews and case study analysis to unravel CSFs in managing operational PPPs.
Originality/value
The findings of this study are considerably beneficial to both public authorities and private operators. They inform practitioners of the strategic procedures and measures to employ in optimising the operational performance of PPP projects. Further, the methodology employed allows project management experts to reliably select the operational management CSFs for their projects.
Subject
Business and International Management,Strategy and Management
Reference76 articles.
1. A survey of the payment mechanisms for transportation DBFO projects in British Columbia;Construction Management and Economics,2007
2. Abdi, H. (2003), “Factor rotations in factor analyses”, in Lewis-Beck, M., Bryman, A. and Futing, T. (Eds), Encyclopedia for Research Methods for the Social Sciences, Sage, Thousand Oaks, CA, pp. 792-795.
3. Objectives, success and failure factors of housing public-private partnerships in Malaysia;Habitat International,2011
4. Critical success criteria for mass house building projects in developing countries;International Journal of Project Management,2008
5. Achieving best value in private finance initiative project procurement;Construction Management and Economics,2003
Cited by
62 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献