An early-stage project complexity assessment tool for the AEC industry

Author:

Vaz-Serra Paulo,Edwards Peter,Aranda-Mena Guillermo

Abstract

Purpose Complex projects require careful management. They may expose stakeholders to greater risks and place additional demands upon resources. In the initial stages of project development, however, little may be known about the nature and magnitude of such complexity. This paper aims to ensure that this gap is at least subjectively assessed and addressed. Design/methodology/approach Research, using focus group workshops with a convenience sample of construction professionals, was carried out to test the validity of a Project Early Stage Complexity Assessment Tool (PESCAT). The PESCAT concept brings together selected complexity theories and uses subjectively based measures for assessment. Findings The findings confirm that an early-stage project complexity assessment tool is practicable and can contribute to project management practice in the construction industry. It should be applied by individual project stakeholders using small teams of experienced staff. PESCAT explores project complexity through “filter” sets of perspective factors which should be customised to reflect the stakeholder’s role and processes in a project. Originality/value In the initial complexity assessment model, resolution space and uncertainty were tested as project complexity parameters. However, in subsequent versions of the tool, four measures (differentiation and differentiation uncertainty; interdependency and interdependency uncertainty) are used in an innovative way that focuses users’ attention more clearly and points to a more targeted approach for addressing project complexity. The value of our model lies in its practical application and the project management benefits it can deliver.

Publisher

Emerald

Subject

Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering

Reference34 articles.

1. Shared leadership and team creativity: construction industry perspective;Journal of Construction Engineering and Management,2020

2. The importance of complexity for the research agenda in the built environment;Architectural Engineering and Design Management,2008

3. Towards a new synthesis in the modeling of evolving complex systems;Environment and Planning B: Planning and Design,1985

4. Aranda-Mena, G. (2003), “Mapping workers’ cognitive structures of construction site hazards”, Unpublished PhD Thesis, School of Construction Management and Engineering, University of Reading, UK.

5. The concept of project complexity – a review;International Journal of Project Management,1996

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3