Abstract
This paper is based on a review of the literature on construction productivity and findings from a survey investigating, first, whether there are significant differences in opinions between head office personnel and site managers on factors that influence construction productivity and, second, to determine groups of factors that mostly influence site productivity. A critical discussion is structured under three general headings: (1) management factors; (2) employee motivation; and (3) experience and training. Twenty‐nine factors were extracted from the above headings and were assessed by 19 head office personnel and 17 site managers. The survey indicated that both samples regard ‘ineffective project planning’ and ‘constraints on a worker's performance’ as the most crucial factors influencing productivity. Other highly ranked factors by both samples are ‘difficulties with material procurement’, ‘lack of integration of project information’, ‘disruption of site programme’, ‘lack of experience and training’ and ‘exclusion of site management from contract meetings’. Ultimately, when the factor analysis technique was applied on the 29 factors, the result shows that Resource Management Effectiveness appeared to be the most dominant group of factors influencing construction productivity.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献