Abstract
Abstract Spatial considerations are important at multiple stages in the development of a deep-sea mining (DSM) project, from resource definition, to identification of preservation and management zones within a contract area, to planning of suitable ecological strata for baseline
studies and impact assessment, to mine planning and adaptive management. Large investments are made to collect remote sensing data early in exploration to support geological resource studies, but environmental considerations are often instigated at later stages of exploration and can become
disconnected from spatial frameworks. We outline a process of harmonizing the environmental and geological aspects of DSM project development by incorporating a habitat approach early in the development cycle. This habitat approach supports ecosystem-based management, which is a central requirement
of environmental assessments. Geostatistical techniques are described that are used alongside a hierarchical classification scheme to describe and map geoforms and substrates. This foundational habitat model can form the basis of spatially explicit ecosystem models and can inform sampling
design and spatial planning at critical junctures of a project development, ensuring that sampling campaigns are connected by an ecosystem logic early in the cycle. We provide an example application from the NORI-D polymetallic nodule exploration contract area in the Clarion-Clipperton Zone.
Publisher
Marine Technology Society
Subject
Ocean Engineering,Oceanography
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献