AbstractThe Finite-Volume Community Ocean Model (FVCOM) is configured to evaluate the potential impact of the proposed Muskeget Tidal Energy Project on circulation and sediment transport in the surrounding region. The extraction of tidal kinetic energy from the water column
is modeled by augmenting the momentum equations with additional drag terms parameterized using local flow velocities and parameters specific to the installed turbine farm. Model-computed power output compares well with estimates based on velocities derived from a shipboard acoustic Doppler
current profiler (ADCP). Total extracted power from the proposed installations during a spring ebb tide represents roughly 9% of the natural power in the deep section of the channel and 30% of the natural tidal dissipation in the turbine installation region. Due to this low level of extraction,
turbine installations at the proposed transects result in relatively minor differences in the tidal current magnitude (2.5%), water level (0.8%), sediment flux (0.6%), and bed level (9%). Computations also indicate that the proposed installation generates minimal impacts to the tidal harmonics
(3.3% change in amplitude and 1-min delay in phase) and tide-induced depth-averaged residual currents (2.8%). Model-computed extraction at increased levels is associated with greater perturbations to the natural conditions.
Publisher
Marine Technology Society
Subject
Ocean Engineering,Oceanography
Reference48 articles.
1. Quantification of Exploitable Tidal Energy Resources in UK Waters: Main Text and Appendices,2007
2. Phase II UK tidal stream energy resource assessment;Black,2005
3. How much energy can be extracted from moving water with a free surface: A question of importance in the field of tidal current energy?;Bryden;Renew Energ,2007
4. Wind Energy Handbook
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献