AbstractEach year, automotive OEMs implement a variety of Engineering Changes (ECs) in their production. In the timing of ECs, different KPIs are often in conflict with one another or even unknown to the OEMs. Therefore, OEMs struggle to identify the optimal date to implement an EC. This paper presents a method to determine the cost-optimal implementation date for each EC, considering time, cost, and quality KPIs based on a new EC classification rule-set. To evaluate the presented method, case-studies at a German automotive OEM were performed, two of which are discussed.
Publisher
Cambridge University Press (CUP)
Reference23 articles.
1. Engineering change administration: the key issues;Balcerak;Computer Integrated Manufacturing Systems,1992
2. Jin, Y. L. and Tang, T. (2013), “Research on manufacturing engineering change implementation planning”, Advanced Materials Research, Vol. 658, pp. 460–463. 10.4028/www.scientific.net/AMR.658.460
3. Engineering change request management in a new product development process;Bhuiyan;European Journal of Innovation Management,2006
4. Barroso, Pimentel , P. (2019), Engineering Change Management Framework for Products with Multiple Parts and Sub-System Assembly Produced as High Volume at Small-Time Rate, [PhD Thesis], Federal University of Santa Catarina.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献