Potential threats of glacial lake changes to the Sichuan-Tibet Railway

Author:

Peng Menger,Zhang Guoqing,Yu Jinyuan,Wang Weicai,Xu Fenglin,Rinzin Sonam

Abstract

Abstract The Sichuan-Tibet Railway, China's second inland railway to Tibet, is currently being constructed and will run between Chengdu and Lhasa. It will cross the southeastern Tibetan Plateau and be surrounded by glacial lakes, some of which may pose a threat of glacial lake outburst flood (GLOF) events. Both the specific location and the outburst susceptibility of these glacial lakes are largely unknown. In this study, we mapped the glacial lakes using declassified Corona KH-4 and Hexagon KH-9 from the 1960s and Sentinel-2 imagery from 2020 and assessed their spatio-temporal changes. GLOF-susceptibility criteria were established based on historical GLOF events. The results show that the total area (number) of glacial lakes has increased by 22% (20%) from 126.1 ± 2.4 km2 (1662 lakes) in the 1960s to 153.6 ± 11.1 km2 (1994 lakes) in 2020. Of these lakes, this study identified 38 very high and 85 high GLOF-susceptibility lakes; mainly distributed along the Bomi-Nyingchi railway section in the Parlung Zangbo River basin. Four of the very high GLOF-susceptibility glacial lakes may pose a threat to the railway and will require monitoring. The insights from this study can be used to mitigate the risk of GLOFs during the construction and maintenance of the Sichuan-Tibet Railway.

Publisher

Cambridge University Press (CUP)

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3