Abstract
AbstractDue to the vast ocean area and limited human and material resources, hydrographic survey must be carried out in a selective and well-planned way. Therefore, scientific planning of hydrographic surveys to ensure the effectiveness of navigational charts has become an urgent issue to be addressed by the hydrographic office of each coastal state. In this study, a reasonable calculation model of hydrographic survey cycle is established, which can be used to make the plan of navigational chart updating. The paper takes 493 navigational charts of Chinese coastal ports and fairways as the research object, analyses the fundamental factors affecting the hydrographic survey cycle and gives them weights, proposes to use the BP neural network to construct the relationship between the cycle and the impact factors, and finally establishes a calculation model of the hydrographic survey cycle. It has been verified that the calculation cycle of the model is effective, and it can provide reference for hydrographic survey planning and chart updating, as well as suggestions for navigation safety.
Publisher
Cambridge University Press (CUP)
Subject
Ocean Engineering,Oceanography
Reference25 articles.
1. A BP-neural network predictor model for plastic injection molding process
2. Research on the Total Factor Productivity and Decomposition of Chinese Coastal Marine Economy: Based on DEA-Malmquist Index
3. On structures of supervised linear basis function feedforward three-layered neural networks;Gao;Chinese Journal of Computers,1998
4. Research on bathymetric survey cycle;Ling;Hydrographic Surveying and Charting,2002
5. The random function in Matlab;Zhang;Artificial Intelligence and Identification Techniques,2010
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献