Author:
Laska E.,Meisner M.,Siegel C.
Abstract
A problem in optimal resource allocation is considered for n jobs with identically distributed service times admitting a monotone hazard function. If the hazard function is increasing, it is shown that the procedure of allocating the full resource individually to each job until its completion minimizes the expected completion time of the jth job. The procedure which at any instant of time equally allocated the resource among all of the remaining jobs is shown to minimize the expected total cumulative waiting time if the hazard is decreasing.
Publisher
Cambridge University Press (CUP)
Subject
Statistics, Probability and Uncertainty,General Mathematics,Statistics and Probability
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献