Author:
Weiss Gideon,Pinedo Michael
Abstract
We consider preemptive scheduling of N tasks on m processors; processors have different speeds, tasks require amounts of work which are exponentially distributed, with different parameters. The policies of assigning at every moment the task with shortest (longest) expected processing time among those not yet completed to the fastest processor available, second shortest (longest) to the second fastest etc., are examined, and shown to minimize expected values of various cost functions. As special cases we obtain policies which minimize expected flowtime, expected makespan and expected lifetime of a series system with m component locations and N spares.
Publisher
Cambridge University Press (CUP)
Subject
Statistics, Probability and Uncertainty,General Mathematics,Statistics and Probability
Cited by
25 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献