1. Chen, J. & Thorp, J.S. (2002).A reliability study of transmission system protection via a hiddenfailure DC load flow model. InIEE Fifth International Conference on Power System Management andControl, pp.384–389.
2. Consul, P.C. (1974).A simple urn model dependent upon predetermined strategy.Sankhya: The Indian Journal of Statistics, Series B 36(4):391–399.
3. Carreras, B.A. , Newman, D.E. , Dobson, I. , & Poole, A.B. (2004).Evidence for self-organized criticality in a time series ofelectric power system blackouts.IEEE Transactions on Circuits and Systems I: Regular Papers 51(9):1733–1740.
4. NERC (North American Electric Reliability Council) (2002).1996 system disturbances.Princeton, NJ:NERC.
5. DeMarco, C.L. (2001).A phase transition model for cascading network failure.IEEE Control Systems Magazine 21(6):40–51.