Small-scale Hydroelectric Power for Developing Countries: Methodology of Site-selection Based on Environmental Issues

Author:

Cada Glenn F.,Zadroga Frank

Abstract

Small Hydropower Projects (SHPs), defined as including hydroelectric generating facilities with capacities of 1,000 kW or less, have great potential for elevating the standard of living and contributing to the economic growth of isolated rural communities especially in Third World countries. However, construction and operation of an SHP can result in adverse environmental impacts that should be assessed in the initial stages of site-selection and avoided in the development.Environmental concerns can be factored into a site-selection process both at the screening and feasibility stages. The screening study is the process by which a large number of potential sites are reduced to a much smaller number of candidate sites based on coarsegrained engineering, socio-economic, and environmental, criteria. Although many of the factors determining the suitability of a given site at the screening stage involve basic engineering or economic questions, fundamental environmental issues that should be addressed include an appropriate resource-development strategy to accompany the SHPs, the quality and quantity of water available for all project needs, the presence of near-by protected areas, habitats, or important species, and the adequacy of local support for environmental protection requirements of the project.The feasibility study is the final stage of site selection, where a relatively small number of candidate SHP sites are examined in proper detail and the best are selected for development. Potential environmental impacts of SHPs range from flow-disruption downstream to the spread of water-borne diseases and parasites, and are related to the design and size of the facility. We provide a check-list of environmental data that should be collected at this stage in order to judge the significance of projected impacts of candidate SHPs.It is important that site selection and impact evaluation be conducted by competent individuals with formal training and experience in an appropriate environmental field. After compiling relevant information (e.g., through literature searches and contacts with government agencies or universities), the feasibility study team should visit the site of each at all likely-to-be chosen SHP. This will allow the interdisciplinary team's members to identify any previously unanticipated problems, to receive inputs from the local community, and to weigh the various benefits and consequences of SHP development before making their final selection.

Publisher

Cambridge University Press (CUP)

Subject

Health, Toxicology and Mutagenesis,Management, Monitoring, Policy and Law,Nature and Landscape Conservation,Pollution,Water Science and Technology

Reference22 articles.

1. Fumbled help at the well;Stein;Environment,1977

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Global proliferation of small hydropower plants - science and policy;Frontiers in Ecology and the Environment;2018-01-10

2. Ecological effects of river regulation on mammals and birds: A review;Regulated Rivers: Research & Management;1994-03

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3