1. [1] Seraderian, R.; Culmo, M.P.; et al. Guidelines for Accelerated Bridge Construction Using Precast/Prestressed Concrete Elements Including Guideline Details; PCINER-06-ABC; PCI Northeast Bridge Technical Committee: 2014.
2. [2] P, C.M. Connection Details for Prefabricated Bridge Elements and Systems; NO. FHWA-IF-09-010; Federal Highway Administration Research and Technology: Washington, D.C: FHWA, 2009.
3. [3] Sun, M.; Li, J.; Xia, J.; Xia, Z. Trial-design of Semi-prefabricated UHPC Shell Composite Cap Beam. Journal of Water Resources and Architectural Engineering 2020, 18, 105-110, doi:10.3969/j.issn.1672-1144.2020.04.017.
4. [4] Khaleghi, B.; Schultz, E.; Seguirant, S.; Marsh, L.; Haraldsson, O.; Eberhard, M.; Stanton, J. Accelerated bridge construction in Washington State: From research to practice. PCI Journal 2012, 34-49.
5. [5] Ge, J.; Mei, D.; Yan, X.; Wang, Z. Comparison and Analysis of Construction Method of Precast Pier Cap. Journal of Technology 2018, 18, 56-62, doi:CNKI:SUN:SHSX.0.2018-01-009.