1. 1) Cabimet Office, Disaster prevention response examination based on earthquake observation and evaluation along the Nankai Trough Working Group : Evaluation of Disaster Prevention Based on Earthquake Observation and Evaluation along the Nankai Trough Direction of Working Group Together (Proposal), 2016. 9 (in Japanese) 内閣府:南海トラフ沿いの地震観測・評価に基づく防災対応検討ワーキンググループとりまとめ方向性(案)2016. 9
2. 2) Industrial Council Security Subcommittee Safety Subcommittee : Electrical Equipment Earthquake Countermeasures Working Report, 2013.3 (in Japanese) 産業構造審議会保安分科会電力安全小委員会:電気設備地震対策ワーキング報告書, 2013. 3
3. 3) ETRA : Seismic Design of Transmission Towers and Issues, Vol.73, No.3, 2018.3 (in Japanese) 電気協同研究会:送電用鉄塔耐震設計とその課題, 第 73 巻, 第 3 号, 2018. 3
4. 4) TEPCO : Supplementary Explanation on the analysis of seismic observation data acquired during the 2007 Niigata-ken-Oki-Chuetsu Earthquake at the Kashiwazaki-Kariwa Nuclear Power Station, 2008.7 (in Japanese) 東京電力株式会社:柏崎刈羽原子力発電所における平成 19 年新潟県沖中越地震時に取得された地震観測データの分析に関する補足説明, 2008. 7
5. 5) Suzuki, T., Ogawa, T., Satoh, N., Fukasawa, T. : Study on Buckling Strength of Tubular Trussed Tower (Part 2)- Case of Buckling at Bracing Member having Shear Bolted Joints-, Journal of Structural and Construction Engineering (Transactions of AIJ), No.434, pp.125-135, 1992.4 (in Japanese) 鈴木敏郎, 小河利行, 佐藤亘宏, 深沢隆:塔状トラス骨組の座屈耐力に関する研究(その 2)端部がせん断ボルト接合される斜材で座屈場合, 日本建築学会構造系論文報告集, 第 434 号, pp.125-135, 1992. 4