1. 1) Steel Construction Institute (SCI): Investigation of Broadgate Phase 8 Fire, 1991
2. 2) Routley, J. G., Jennings, C., and Chubb, M.: Highrise Office Building Fire One Meridian Plaza Philadelphia, Pennsylvania, U.S. Fire Administration/Technical Report Series, USFA-TR-049, 1991.2
3. 3) Kirby, B. R.: Large Scale Fire Tests: The British Steel European Collaborative Research Programme on the BRE 8-Storey Frame, Proceedings of the 5th International Symposium on Fire Safety Science (IAFSS), Melbourne, Australia, pp.1129–1140, 1997
4. 4) Kirby, B. R.: The Behavior of a Multi-storey Steel Framed Building Subjected to Fire Attack, Experimental Data, British Steel (now Corus), Swinden Laboratories, Rotherham, 1998
5. 5) Wald, F., Silva, L., Moore, D. B., Lennon, T., Chladna, M., Santiago, A., Benes, M., and Borges, L.: Experimental behavior of a steel structure under natural fire, Fire Safety Journal, 41(2006), pp. 509–522 (DOI: https://doi.org/10.1016/j.firesaf.2006.05.006)