Predicting the effects of reservoir water level management on the reproductive output of a riparian songbird

Author:

Hepp Mathew,Palsson Eirikur,Thomsen Sarah K.,Green David J.ORCID

Abstract

Dams and reservoirs alter natural water flow regimes with adverse effects on natural ecosystems. Quantifying and reducing these effects are important as global demands for energy and water, and the number of dams and reservoir, increase. However, costs and logistic constraints typically preclude experimental assessment of reservoir effects on the environment. We developed a stochastic individual-based model (IBM), parameterized using empirical data, to estimate the annual productivity of yellow warblers that breed in riparian habitat within the footprint of the Arrow Lakes Reservoir in British Columbia, Canada. The IBM incorporated information on breeding phenology, nest site selection, brood parasitism, daily nest survival, re-nesting probabilities and post-fledging survival. We used the IBM to estimate the effect of four different water management scenarios on annual productivity. We found that the IBM accurately estimated average nest success (0.39 ± 0.10 SD), the proportion of females that produced at least one fledgling during a breeding season (0.56 ± 0.11), and annual fledging success (2.06 ± 0.43) under current conditions. The IBM estimated that reservoir operations currently reduce the annual productivity of this population by 37%, from an average of 1.62 to 1.06 independent young/female. Delaying when reservoir water levels reach 435m asl (the minimum elevation occupied by yellow warblers) by approximately 2 weeks was predicted to increase annual productivity to 1.44 independent young/female. The standardized effect on annual productivity of reducing the maximum elevation of the reservoir so that yellow warbler habitat is not inundated (Cohen’s d = 1.52) or delaying when water is stored (Cohen’s d = 0.83) was primarily driven by inundation effects on post-fledging survival. Reservoir operation effects on breeding birds will be species specific, but this IBM can easily be modified to allow the environmental impacts on the entire breeding bird community to be incorporated into water management decisions.

Funder

Natural Sciences and Engineering Research Council of Canada

Columbia Basic Fish and Wildlife Compensation Program

Environment and Climate Change Canada to the Centre for Wildlife Ecology

BC Hydro Water License Requirements to Cooper Beauchesne and Associates Ltd

Publisher

Public Library of Science (PLoS)

Subject

Multidisciplinary

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3