Application of Bayesian structural equation modeling in construction and demolition waste management studies: Development of an extended theory of planned behavior

Author:

Mohamed Nur AnisahORCID,Alanzi Ayed R. A.,Azizan Azlinna Noor,Azizan Suzana Ariff,Samsudin Nadia,Salarzadeh Jenatabadi HashemORCID

Abstract

Sustainable construction and demolition waste management relies heavily on the attitudes and actions of its constituents; nevertheless, deep analysis for introducing the best estimator is rarely attained. The main objective of this study is to perform a comparison analysis among different approaches of Structural Equation Modeling (SEM) in Construction and Demolition Waste Management (C&DWM) modeling based on an Extended Theory of Planned Behaviour (Extended TPB). The introduced research model includes twelve latent variables, six independent variables, one mediator, three control variables, and one dependent variable. Maximum likelihood (ML), partial least square (PLS), and Bayesian estimators were considered in this study. The output of SEM with the Bayesian estimator was 85.8%, and among effectiveness of six main variables on C&DWM Behavioral (Depenmalaydent variables), five of them have significant relations. Meanwhile, the variation based on SEM with ML estimator was equal to 78.2%, and four correlations with dependent variable have significant relationship. At the conclusion, the R-square of SEM with the PLS estimator was equivalent to 73.4% and three correlations with the dependent variable had significant relationships. At the same time, the values of the three statistical indices include root mean square error (RMSE), mean absolute percentage error (MPE), and mean absolute error (MSE) with involving Bayesian estimator are lower than both ML and PLS estimators. Therefore, compared to both PLS and ML, the predicted values of the Bayesian estimator are closer to the observed values. The lower values of MPE, RMSE, and MSE and the higher values of R-square will generate better goodness of fit for SEM with a Bayesian estimator. Moreover, the SEM with a Bayesian estimator revealed better data fit than both the PLS and ML estimators. The pattern shows that the relationship between research variables can change with different estimators. Hence, researchers using the SEM technique must carefully consider the primary estimator for their data analysis. The precaution is necessary because higher error means different regression coefficients in the research model.

Publisher

Public Library of Science (PLoS)

Subject

Multidisciplinary

Reference49 articles.

1. Status quo and future directions of construction and demolition waste research: A critical review;H. Wu;Journal of Cleaner Production,2019

2. Transformation towards a circular economy in the Australian construction and demolition waste management system;S. Shooshtarian;Sustainable Production Consumption,2022

3. Improving contractors’ participation of resource utilization in construction and demolition waste through government incentives and punishments;B. Cheng;Environmental Management,2022

4. Evolutionary game model of construction enterprises and construction material manufacturers in the construction and demolition waste resource utilization;Z. Shao;Waste Management Research,2022

5. Recycled construction and demolition waste material: A cost–benefit analysis under uncertainty;M.-L. Tseng;Management of Environmental Quality: An International Journal,2021

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3