Abstract
In order to solve the problem of unbalanced workload of employees in parallel flow shop scheduling, a method of job standard balance is proposed to describe the work balance of employees. The minimum delay time of completion and the imbalance of employee work are taken as the two goals of the model. A bi-objective nonlinear integer programming model is proposed. NSGA-II-EDSP, NSGA-II-KES, and NSGA-II-QKES heuristic rule algorithms are designed to solve the problem. A number of computational experiments of different sizes are conducted, and compared with solutions generated by NSGA-II. The experimental results show the advantages of the proposed model and method, which error is reduced 14.56%, 15.16% and 15.67%.
Publisher
Public Library of Science (PLoS)
Reference33 articles.
1. Cluster equilibrium scheduling method based on backpressure flow control in railway power supply systems;Z Qu;PLOS ONE.,2020
2. Parallel flow shop scheduling problem using probability learning based evolutionary algorithm;HL Pang;Control Theory & Applications,2005
3. Implementation of an automated scheduling tool improves schedule quality and resident satisfaction;FM Howard;PLOS ONE,2020
4. Enumerative approaches to parallel flowshop scheduling via problem transformation.;WB Gooding;Computers & Chemical Engineering,1994
5. Quantum Evolutionary Algorithm for Chemical Parallel Flow Shop Scheduling Problem.;T Qi;2015 AASRI International Conference on Industrial Electronics and Applications,2015
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献