“The times they are a-changin’”: A longitudinal, mixed methods case study of a hospital transformation

Author:

Pomare ChiaraORCID,Gardiner Brett,Ellis Louise A.,Long Janet C.ORCID,Churruca Kate,Braithwaite Jeffrey

Abstract

Background Changes to hospital infrastructure are inevitable in ever-evolving healthcare systems. The redevelopment of hospitals and opening of new buildings can be a complex and challenging time for staff as they must find ways to deliver safe and high-quality care while navigating the complexities and uncertainties of change. This study explores the perspectives and experiences of staff and patients before and after the opening of a new hospital building as part of a large public hospital redevelopment in Sydney, Australia. Methods The study comprised a longitudinal mixed methods case study design. Methods included two rounds of staff surveys (n = 292 participants), two rounds of staff interviews (n = 66), six rounds of patient surveys (n = 255), and analysis of hospital data at tri-monthly intervals over two years. Data were compared before (2019) and after (2020) a new hospital building opened at a publicly funded hospital in Sydney, Australia. Results Four key themes and perspectives emerged from the interviews including change uncertainty, communication effectiveness, staffing adequacy and staff resilience. Significant differences in staff perceptions of change readiness over time was identified. Specifically, perceptions that the organisational change was appropriate significantly decreased (2019: 15.93 ± 3.86; 2020: 14.13 ± 3.62; p < .001) and perceptions that staff could deal with the change significantly increased (2019: 17.30 ± 4.77; 2020: 19.16 ± 4.36; p = .001) after the building opened compared to before. Global satisfaction scores from patient survey data showed that patient experience significantly declined after the building opened compared to before (2020: 81.70 ± 21.52; 2019: 84.43 ± 18.46)), t(254) = -64.55, p < 0.05, and improved a few months after opening of the new facilities. This coincided with the improvement in staff perceptions in dealing with the change. Conclusions Moving into a new hospital building can be a challenging time for staff and patients. Staff experienced uncertainty and stress, and displayed practices of resilience to deliver patient care during a difficult period of change. Policy makers, hospital managers, staff and patients must work together to minimise disruption to patient care and experience. Key recommendations for future hospital redevelopment projects outline the importance of supporting and informing staff and patients during the opening of a new hospital building.

Funder

Australian Government Research Training Program

National Health and Medical Research Council

Publisher

Public Library of Science (PLoS)

Subject

Multidisciplinary

Reference42 articles.

1. Complexity science: The challenge of complexity in health care;PE Plsek;BMJ,2001

2. Organizational change and development;KE Weick;Annual Review of psychology,1999

3. Resilient health care: Turning patient safety on its head;J Braithwaite;International Journal for Quality in Health Care,2015

4. Design of health care technologies for the developing world;RA Malkin;Annual Review of Biomedical Engineering,2007

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3