1. Goodchild A V. Crane double cycling in container ports: algorithms, evaluation, and planning[J]. University of California Transportation Center, 2005.
2. The crane scheduling problem[J];C F Daganzo,1989
3. System development for dual cycle both loading and unloading process [J];Wang Jiamin,2006
4. Double cycling strategies for container ships and their effect on ship loading and unloading operations [J];A V Goodchild,2006
5. Maximizing the number of dual-cycle operations of quay cranes in container terminals [J];H Zhang,2009