Abstract
Large hydropower projects continue to be built in developing nations, despite their known negative impacts. Large-scale energy projects strain local infrastructure and reduce access to infrastructure for households that live near them. Here we investigate the link between large-scale hydropower projects and stress. Our results suggest that these projects create stress through two mechanisms: strains on community resources and through the process of displacement. We also ask how compensation and resettlement programs condition these relationships. Using data from the Madeira river basin in the Brazilian Amazon, we find that hydropower projects increase stress by reducing access to energy, water, sanitation and land. Compensation provided was not sufficient to moderate this effect.
Funder
National Science Foundation
Publisher
Public Library of Science (PLoS)
Reference77 articles.
1. A global boom in hydropower dam construction.;C Zarfl;Aquatic Sciences,2015
2. Hydropeaking operations of two run-of-river mega-dams alter downstream hydrology of the largest Amazon tributary;RM Almeida;Frontiers in Environmental Science,2020
3. Planning for a renewable future in the Brazilian power system.;GG Dranka;Energy,2018
4. Contradictions of green development: Human rights and environmental norms in light of Belo Monte dam activism;EZ Bratman;Journal of Latin American Studies,2014
5. Passive revolution in the green economy: activism and the Belo Monte dam.;E. Bratman;International Environmental Agreements: Politics, Law and Economics.,2015
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献