Abstract
In the prefabricated construction industry, consumers are sensitive to the construction delivery time, and different power structures are very common. This research uses methods of Stackelberg game, Nash game and supply chain coordination, introduces a manufacturer crashing strategy into a prefabricated construction supply chain and investigates the assembler pricing, manufacturer crashing, and supply chain coordination strategies under three different power structures. It finds that adopting a crashing strategy improves the supply chain’s profit, while the dynamic wholesale price contract achieves supply chain coordination. Meanwhile, when consumer time and price sensitivity are low, it is easier to achieve high profits in the supply chain under unequal power distribution. Conversely, the supply chain profit is higher in the case of a Nash game. This study innovatively introduces the thought of power structure and crashing strategy into the prefabricated construction supply chain, and provides the optimal price and delivery time under three different power structures for prefabricated construction enterprises and realizes supply chain coordination. The conclusion can provide decision suggestions for the prefabricated construction enterprises under different competitive environments.
Funder
Youth Foundation for Humanities and Social Sciences of Ministry of Education of China
Sichuan Science and Technology Program
National Natural Science Foundation of China
Key research base of humanities and Social Sciences of Sichuan Province-Research Center of Sichuan County Economy Development
Publisher
Public Library of Science (PLoS)
Reference51 articles.
1. Carbon emission reduction and profit distribution mechanism of construction supply chain with fairness concern and cap-and-trade.;W Jiang;PLoS One,2019
2. How to promote prefabricated building projects through internet of things? A game theory-based analysis;Z Luo L;Journal of Cleaner Production.,2020
3. Life cycle assessment of a prefabricated house for seven locations in different climates;V Tavares;Journal of Building Engineering.,2022
4. Game theory-based incentive policy for assembled buildings;C Ying L;Journal of Civil Engineering and Management,2018
5. Green supply chain practices and sustainable performance of mining firms: Evidence from a developing country.;A Benedict O;Cleaner Logistics and Supply Chain,2022
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献