Allocating Safety Cost using in Construction Site
-
Published:2023-10-15
Issue:4
Volume:17
Page:594-597
-
ISSN:1848-5588
-
Container-title:Tehnički glasnik
-
language:
-
Short-container-title:Teh. glas. (Online)
Author:
Kim Yong-woo1,
Kim Sangchul2
Affiliation:
1. Koon Endowed Professor of Construction Management College of Built Environments, University of Washington
2. School of Architecture, Hankyong National University
Abstract
Environments, Health, and Safety (EHS) activities are strongly linked to the concept of sustainability in the current construction industry and consequently absorb more financial and managerial attention. One of major obstacles in EHS costing is that most EHS costs are buried in general overhead costs. Therefore, EHS costs lacks transparency, making it hard to allocate EHS costs to relevant construction projects. This paper present a recent study in which a method of activity-based costing (ABC) has been applied to safety costs at a contractor’s home office. The list of safety activities, their cost drivers as well as their cost information on one of Korean general contractor is provided. The authors expect that the application of ABC will improve transparency in costing EHS costs as well as allocating EHS costs to projects.
Publisher
University North
Subject
Computer Graphics and Computer-Aided Design,Computer Science Applications,General Engineering,Information Systems,Management Information Systems