Prevention Cost Components Priorities for Urban Rail Infrastructure Projects

Author:

Mohd Kamar Izatul Farrita, ,Che Ahmad Asmalia,Mohd Derus Mohmad, ,

Abstract

The Mass Rapid Transit (MRT) and the Light Rail Transit (LRT) have been establishedas the largest transport infrastructure projects in Malaysia and cost over RM40 billion. Due to the vigorous development of both projects, accidents at project sites have causedfatalities, serious injuries,and damage to properties. Many accidents haveoccurred during the operation of rail. In Malaysia, the latest rail accident occurred on 24thMay 2021had injured200 people when two coaches onthe Kelana Jaya LRT line collidedin the capital Kuala Lumpur. Railaccidents create significant economic impacts on the country, stakeholders,and society. Studies on the prevention costs during the pre-construction stage of a project are scarceand have mainly focused on the financial losses or accident costs incurred by the contractor and victim.Amongthe limitations of the existing safety and health cost models is that they do not include the costs incurred by the client for the safety prevention activities. Therefore, this research aims to study the types of prevention cost components that must be the priorities for urban rail infrastructureprojects. The data analysed in this study wasobtained from a total of eight (8) projects involved in the MRT 1 (SBK Line) and ten (10) projects involved in the MRT 2 (SPP Line). The prevention cost components priorities were determined by the coefficient of variation (CV) percentage. The finding shows ten (10) prevention cost components,and nineteen (19) prevention cost items wereallocatedduring the pre-construction phase. The cost components werethe Plant Costs, OSH Management Costs, Housekeeping Costs, Special Work Condition Costs, Evaluation and Monitoring Costs, Emergency Response Costs, Electrical Work Costs, PPE and Training Costs, Facilities on Site Costs, and Insurance Costs. This study finds out that all these prevention cost components are important to prevent accidents for the employees when carrying out work on-site. Therefore,clientsshould considerthe availability of these cost componentsin the planning and preparation phasesof an urban rail infrastructure project.Thus, the most logical amount of prevention cost components can be achieved in the future project and creating the awareness of these costs to the clients.

Publisher

Penerbit UTHM

Subject

Building and Construction,Civil and Structural Engineering,Environmental Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3