The improving of the methodology of resource scheduling – as a way to efficiency increase of the company in transport construction

Author:

Kokodeev Artemii1,Ovchinnikov Igor1

Affiliation:

1. Yuri Gagarin state technical university of Saratov

Abstract

In the last decade, there has been a tendency of profitability reduction of the companies implementing transport construction projects in the Russian Federation. One of the main factors affecting negatively on the market of transport construction, is the imperfection of the current system of pricing in construction oriented to minimize expenditures of the state customer and doesn't cover the estimated contractor cost risks: rising prices for basic construction materials, machines and equipment, increasing in overhead for contract administration, increasing of the credit load and the cost of bank support and project insurance. In this regard, the search for an effective method of project management in the transport construction, using modern technologies of resource scheduling and control of construction projects implementation, is particularly relevant. At the same time, an important task is to select a project management methodology that is optimal for the labor costs of the company's engineering and technical employees. In the article the authors propose the detailed algorithm for developing and maintaining resource construction schedules in the domestic Spider Project program. Features of preliminary study of project documentation, a transfer of corporate reference books to the schedule, a formation of a Work Breakdown Structure, a planning of the labor resources, construction machines and equipment, materials, and cost components are given. A calculating method for the complexity of construction works based on the formation of technological cards is proposed. The possibilities of the Spider Project program in terms of monitoring of the construction schedule execution in the form of accounting for actual work performed, comparing schedule versions and generating plan-fact reports for analyzing the construction progress and making management decisions, are considered.

Publisher

Publishing Company World of Science LLC

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3