Author:
Li Ling,Tang Qiuhua,Zheng Peng,Zhang Liping,Floudas C. A.
Reference7 articles.
1. Li J, Xiao X, Tang QH, Floudas CA (2012) Production scheduling of a large-scale steelmaking continuous casting process via unit-specific event-based continuous-time models: short-term and medium-term scheduling. Ind Eng Chem Res 51(21):7300–7319
2. Gao KZ, Pan QK, Suganthan PN, Li JQ (2013) Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization. Int J Adv Manuf Technol 66(9–12):1563–1572
3. Tang LX, Liu GL (2007) A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan iron and steel complex. Eur J Oper Res 182(3):1453–1468
4. Pacciarelli Dario, Pranzo Marco (2004) Production scheduling in a steelmaking-continuous casting plant. Comput Chem Eng 28(12):2823–2835
5. Zhao Y, Jia FY, Wang GS, Wang LJ (2011) A hybrid tabu search for steelmaking-continuous casting production scheduling problem. In: International symposium on advanced control of industrial processes, ADCONIP, pp 535–540
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献