1. Ma Zhiliang. Technical innovation thinking on the collaborative development of intelligent construction and industrialization of buildings [J]. China Investigation and Design, 2020(09): 28–30. (In Chinese)
2. General Office of the State Council of the People’s Republic of China. Guiding opinions on vigorously developing prefabricated buildings [J]. Building Technology Development, 2017, 44(01): 80. (In Chinese)
3. Li Wenjuan. The action plan for prefabricated buildings in the “13th Five-Year Plan” has been released, and the development of prefabricated buildings is comprehensively promoted [J]. Engineering Construction Standardization, 2017(04): 32–33. (In Chinese)
4. Ding Jia, Wan Guohua. Practice and research review of enterprise production planning and scheduling—From the perspective of socio-technical system [J]. Journal of Management Sciences in China, 2020, 23(12): 110–123. (In Chinese)
5. Leu S S, Hwang S T. GA-based resource-constrained flow-shop scheduling model for mixed precast production [J]. Automation in construction, 2002, 11(4): 439–452.