Author:
Ali Nawras Faris,Mansor Maysoon Abdullah
Abstract
The construction industry in Iraq faces many challenges, the most important of which is the lack of a performance measurement system for construction projects, thus showing the need to understand and identify performance areas that affect the performance of projects. Indicators were collected from and literature review. The Delphi technique was used in three rounds, the first is an open questionnaire and the second is to assess the importance of the indicators through the weighted average and the application of the Pareto principle to choose the most important indicators from the second round. The third round is a pairwise comparisons questionnaire and analyzed by the process of hierarchical analysis using Expert choice program. The most important indicators that are used to measure the success of the performance of construction projects (learning from the best practices and experiences of others) by obtaining (4.29) followed by (the organization's liquidity) by obtaining the importance (4.24) and the third indicator (the planned construction time) by obtaining (4.24). The indicators prioritize and set in a framework to help project managers and stakeholders remove weaknesses and take the necessary measures in a timely manner to reach a high-performing, successful facility therefore, it is preferable to pay attention to the importance of performance measurement for construction projects
Subject
General Earth and Planetary Sciences,General Environmental Science
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献