Affiliation:
1. Electrical Department/ Engineering College/Mosul University / Mosul, Iraq
Abstract
The research strategy focuses on the effect of connecting a STATCOM to mend
critical-clearing-time (CCT) for the studied system and its transient stability. This
paper targets to connect STATCOM in two situations, grouped and distributed. The
first situation connects STATCOM at one placement with 100 MVAR reactive power
while the second situation connects two STATCOMs at two different placements
with the value 50 MVAR for each one and 60 MVAR,40 MVAR in another case. It
has been found through this research that when distributing the necessary
compensation capacity to more than one static synchronous compensator better than
from combined them in one compensator in improving the CCT. It used MATLAB /
ver.2017 for simulation of our studied system (IEEE-9 nodes).
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献