Abstract
Abstract
An optimal flood-limiting water level (FLWL) is needed to solve the contradiction between flood control safety measures and utilizable benefits. Therefore, this paper took the Chengbi River reservoir as an example, applied the Monte Carlo stochastic simulation and water consumption rate per unit of electrical energy methods to calculate the flood control risks and benefits associated with raising the FLWL in stages, and used the fuzzy comprehensive evaluation method to select the optimal FLWL for each stage of the flood season, which provided a scientific basis for the effective use of rainfall and flood data in the reservoir. The major outcomes of the study are as follows. (1) The reservoir flood season can be divided into a preflood season (April to May), a main flood season (June to August), and a later flood season (September to October). (2) The flood risks and power generation benefits of the reservoir are calculated after raising the FLWL, the optimal FLWL for the main flood season is 185.5 m, and the optimal FLWL for the later flood season is 187.50 m, while the FLWL in the preflood season should be kept at 185.0 m. The above results can provide scientific support for flood control safety planning and the optimal operation of reservoirs.
Funder
National Natural Science Foundation of China
National Key Research and Development Program of China
Guangxi Natural Science Foundation of China
Innovation Project of Guangxi Graduate Education
Subject
Water Science and Technology
Reference24 articles.
1. Risk analysis for real-time flood control operation of a reservoir;Journal of Water Resource Planning and Management,2015
2. A decomposition-integration risk analysis method for real-time operation of a complex flood control system;Water Resource Research,2017
3. Flood season staging and its rationality verification for Longtan hydropower station;Water Power,2019
4. Flood risk analysis based on a stochastic differential equation method;Journal of Flood Risk Management,2019