Author:
Clayton J. A.,Ekama G. A.,Wentzel M. C.,Marais G. v. R.
Abstract
Using plugflow anoxic reactors and batch tests, an experimental investigation was undertaken into the kinetics of denitrification in nitrification denitrification biological excess phosphorus removal (NDBEPR) systems. It was found that (1) in the primary and secondary anoxic reactors, the specific rate constant for denitrification associated with the utilization of slowly biodegradable COD (SBCOD) was respectively 2½ and 1½ times higher than in these reactors in nitrification denitrification (ND) systems and (2) in the primary anoxic reactor, the rapid rate of denitrification attributable to readily biodegradable COD was absent. The increased rate is hypothesized to be due to a stimulation in the active sludge mass of an increased rate of hydrolysis of SBCOD in these anoxic reactors of the NDBEPR system apparently induced by the presence of the anaerobic reactor in these systems.
Subject
Water Science and Technology,Environmental Engineering
Cited by
27 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献