Affiliation:
1. Escuela Técnica Superior de Ingeniería, Campus El Carmen, Universidad de Huelva, 21007 Huelva, Spain
Abstract
Abstract
The purpose of this study is to examine the use of hydraulic microturbines to make the most of the hydraulic energy available in pressurized water distribution systems. The study was carried out on suitable points of pressurized hydraulic networks, which are managed by Giahsa, a public enterprise responsible for the management of the municipal communities of services (MAS) in the province of Huelva, southwestern Spain. The distribution system situated between the Cabeza del Pasto reservoir in the Andévalo area (Huelva, Spain) and the wastewater treatment plant (WWTP) in the municipality of Puebla de Guzmán (Huelva, Spain) was examined. To obtain the exact amount of energy which reaches the microturbine, the energy conservation equation considering the loss of energy from friction was used. The results show different locations where it is possible to carry out the installation of a Francis turbine, which can generate an annual energy of approximately 280 MWh per year at the selected point, with an approximate investment cost of €20,000 per year, which means a recovery period of this investment of 2 years.
Subject
Health, Toxicology and Mutagenesis,Water Science and Technology,Environmental Engineering
Reference22 articles.
1. Measurement of the flow rate with the Gibson method in the hydraulic power plant in Bielkowo,1998
2. Calibration of Hazen-Williams coefficients in pipe networks using tracers;Journal of Water Supply: Research and Technology-Aqua,2005
3. Discussion of ‘Limitations and proper use of the Hazen-Williams equation’;Journal of Hydraulic Engineering,2000
4. Optimization of water distribution networks for combined hydropower energy recovery and leakage reduction;Journal of Water Resources Planning and Management,2016
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献