Excess Sludge Discharge Frequency for UASB Reactors

Author:

Cavalcanti Paula Frassinetti Feitosa,Medeiros Erly Joan Souto,Silva Jean Kanuto Menezes,van Haandel Adrianus

Abstract

Like all biological wastewater treatment systems, the UASB reactor produces sludge that accumulates in the reactor. Since the storage capacity is limited, the sludge will eventually be discharged together with the effluent, when the reactor is full of sludge. To avoid the discharge of sludge in the effluent, it is necessary that excess sludge be discharged periodically from the reactor before its storage capacity is exhausted. For minimum operational costs it is preferable to have large discharges with a low frequency. On the other hand the discharges cannot be excessive in order to avoid deterioration of the reactor performance after the discharges. An experimental investigation was carried out at pilot scale to establish the influence of the magnitude of excess sludge discharge on the performance of UASB reactors, treating municipal sewage. UASB reactors were operated at hydraulic retention times (HRT) of 4 and 8 h, and excess sludge discharges of varying magnitude were applied. The performance and operational stability of these reactors after the discharges were observed and the sludge accumulation and unintentional discharge (wash-out) with the effluent were determined. During periods of steady state without excess sludge discharge, the sludge production was determined from the settleable solids in the effluent. The data show that for discharges of up to 50% of the sludge mass in reactors with HRT = 4 hours and 60% with HRT = 8 hours, the reactor efficiency and operational stability were affected very little and only during the first few days after the discharge. Discharges of up to 80% of the sludge did not cause instability, but a reduction of the COD removal efficiency was observed during 1 to 2 weeks after the discharge. Independent of the magnitude of sludge discharge, the effluent pH remained in the narrow range of 6.8 to 7.0 and the ratio between alkalinity (average 275 ppm CaCO3) and VFA concentration (average of 28 ppm HAc) was always very high so that there was never a danger of souring of the reactor contents. Based on the obtained experimental data an operational procedure for optimisation of excess sludge discharges was developed. It is believed that along with the favourable natural conditions during the experimental investigation (average temperature of 27°C), the observed reactor stability can be attributed to a large extent to the design of the used phase separator, which is much more efficient than the conventional one. It is possible that results with a conventional UASB reactor would have been different.

Publisher

IWA Publishing

Subject

Water Science and Technology,Environmental Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3