Abstract
A wastewater from an integrated paper mill with a COD of 1200 mg/dm3 was anaerobically treated in a multi-stage reactor. The BOD7 removal efficiencies of 60-75 % were achieved at maximal loading rates of 5-6 kg COD/m3d and HRT of 4-6 hours due to the granular sludge. Industrial sulphite evaporator condensates from Ca- and Na-processes were treated in anaerobic filters containing light gravel, plastic foam and power plant slag as filter media. The BOD7 removals of 78 % on average were achieved at loading rates of 1.8-3.3 kg COD/m3d with Ca-process evaporator condensates and 80 % BOD7 removals were achieved with Na-process condensates at loading rates of 3.5-4.1 kg COD/m3d.